Project Reference

Epoxy Works

2015 SIA Engineering power plant (1200m2 epoxy mortar topping)
2015-2016 Kimberly-Clark @ Tuas South Ave 8 (4000m2 self-leveling epoxy)
2016 ST Kinetic (1200m2 self-leveling cement with water based epoxy system)
2016-2017 ST Aerospace Seletar and Paya Lebar (3000m2 500micron epoxy system)
2017 OUE @ Bayfront (1000mr epoxy application on kerb)
2017 CGH Skill Lab (Anti bacteria epoxy flooring system)
2017 Nestle R&D Centre @ Quality Road (1000m2 self-leveling epoxy)
2017 Abbott Nutrition @ Tuas South Ave 10 (1200m2 self-leveling epoxy)


Thermoplstic Road Marking And Premixed Bituminous Road


2016 White Sand shopping mall
2017 Grand Park Hotel @ City Hall drop off point and Coleman Street


Wall Painting

2015 SIA Engineering engine power plant
2016 Hyflux Bendemeer Road and Kallang Bahru
2016 Nestle R&D @ Quality Road
2017 Nassim Park Residences washing bay area
2017 OUE @ Bayfront basement car park wall area


General Contracting Works:


2017 Nassim Park Residences change of glass panel, festive lighting and plaster ceiling works.
2017 Sandcrawler Building @ 1 Fusionopolis View concrete plinth construction


Switch to Mobile Version